Energy-saving core
Low-loss construction reduces operating energy use and long-run ownership cost.

Product image from the supplied product image library.
POWER TRANSFORMER
High-voltage oil-immersed equipment for utility, railway, mining, industrial and renewable-energy power systems.
PRODUCT OVERVIEW
The supplied 35kV record covers 1000–10000 kVA oil-immersed power transformers with ONAN and ONAF dual cooling. The compact layout, dependable insulation and flexible voltage regulation support long-term utility and infrastructure operation.
Capacity, secondary voltage, vector group, cooling, high-altitude adaptation and certification are confirmed per project. The Kazakhstan case documents eight 35kV transformers for railway infrastructure in a harsh climate.
CORE FEATURES
Low-loss construction reduces operating energy use and long-run ownership cost.
Natural or fan-assisted oil cooling adapts output to load variation.
High-grade insulation supports power-frequency, induced and impulse withstand requirements.
Tap-change options support stable output when grid voltage fluctuates.
Protection assemblies support rapid fault response and safe, stable operation.
Project engineering can address low temperature, wind-sand and anti-condensation requirements.
TECHNICAL PARAMETERS
The final data sheet is issued after the duty, standards and site conditions are confirmed.
| Parameter | Supplied range / option |
|---|---|
| Rated power | 1000, 2000, 3150, 4000, 5000, 6300, 8000 or 10000 kVA |
| Primary voltage | 35 kV ±2 × 2.5% or ±3 × 2.5% |
| Secondary voltage | 6.3, 10.5, 11 or 20 kV |
| Cooling | ONAN / ONAF dual cooling |
| Frequency | 50 Hz; 60 Hz available on request |
| Vector group | Dyn11 or YNd11; standard Dyn11 |
| Winding material | High-purity oxygen-free copper |
| Efficiency | ≥98.0%–99.7%, increasing with rated power |
| Standards | IEC 60076, GB/T 1094 and agreed project requirements |
APPLICATIONS
Use the 35kV route where project-specific engineering, high capacity and dependable service support are required.
PROJECT PROOF
FAQ
ONAN / ONAF selection follows the load profile, ambient conditions and required full-load output.
Yes. The supplied record lists several secondary voltages and Dyn11 or YNd11 vector groups for project review.
Routine and type-test records, ratio, resistance, no-load, load and withstand test documentation are prepared for the approved configuration.
The supplied record describes approximately 30–45 days after deposit and full technical confirmation, subject to quantity and configuration.
PRODUCT ENQUIRY
Share duty, climate, standards, capacity, ratio and delivery requirements.
35KV POWER TRANSFORMER
Use the inquiry form for engineering review and a project-specific quotation.